Gas Stations of Niagara Region

n Architecture Inc, a progressive Architecture firm based in the GTA has worked on various Gas Stations throughout Canada, some of which are in the Niagara region. A few of these gas stations are now complete and functional and can be found in Welland, Pelham and Thorold. The gas station in Pelham, which is a…

McDonald’s & Petro-Canada Gas Station in Schomberg, Ontario – by n Architecture Inc., Architects in the Greater Toronto Area

n Architecture Inc. was commissioned to work on this project in 2014. Amalgamating the exterior design philosophies of two iconic brands – McDonald’s and Petro Canada was an interesting design exercise, however in the end a lot of common ground was found which resulted in this final design. The McDonald’s branding was presented in grey…

Shell Gas Station, Convenience Store & Tim Horton’s in Kawartha Lakes, Ontario – by n Architecture Inc., Architects in the Greater Toronto Area

The proposed Gas Station site in Coboconk, was designed for our Client Mr Hardeep Grewal. The site lays on the intersection of Highway 35 and Grandy Rd. It is on the northern tip of Balsam Lake; the home to Canada’s Fresh Water Summit, which is the highest elevation of navigable water in Canada and third…

Projects Under Construction in 2018 – By n Architecture Inc. – Architects in the Greater Toronto Area

As the end of the year approaches, we would like to present the current under construction projects from n Architecture Inc. 2018 was a very busy year for n Architecture Inc., with a total of 16 projects currently undergoing construction and/or renovations. These projects vary from temples, car wash, hotels and offices to industrial buildings…

McDonald’s and Petro-Canada at 65 Dilane Drive, Schomberg, Ontario – by n Architecture Inc. – Architects in the Greater Toronto Area

n Architecture Inc. got commissioned to work on this project in 2014. Amalgamating the exterior design philosophies of two iconic brands – McDonald’s and Petro-Canada was not easy but in the end a lot of common ground was found which resulted in this final design. This location is expected to be fully operational by early…